2-SPEED GCDINSTALLATION MANUALDISASSEMBLYTHIS SEQUENCE APPLIES ONLY TO MANUAL/ MECHANICAL TYPE TRANSFER CASE.NOTE: Transfer case does not need to be removed from the vehicle for GCD installation. 1. REMOVE REAR PROP- SHAFT. Discard shaft, a shorter shaft is supplied with GCD kit. 2. REMOVE REAR COMPANION FLANGE.
3. REMOVE 4WD INDICATOR LIGHT SWITCH. 4. REMOVE SPEEDO DRIVEN GEAR AND CABLE. 5. REMOVE REAR OUTPUT SHAFT REAR BEARING HOUSING Discard housing, a new one is supplied with GCD kit.
6. REMOVE POWER TAKE-OFF COVER. This allows access to the transfer case bolts. 7. REMOVE IDLER GEAR SHAFT LOCK PLATE. 8. REMOVE TRANSFER REAR CASE.
NOTE: Use extreme caution in splitting the case, keeping the split even so that the case does not jam. The separation is helped by tapping the idler shaft in. 9. REMOVE REAR OUTPUT SHAFT ASSEMBLY. Remove shift fork and shaft and slide out assembly. NOTE: Gear box must be in neutral. 10. REMOVE IDLER SHAFT O-RING. 11. REMOVE REAR OUTPUT SHAFT FRONT BEARING RETAINER. 12. INSTALL NEW BEARING CUP INTO RETAINER A new cup is supplied in GCD KIT 13. INSTALL NEW REAR OUTPUT SHAFT REAR BEARING CUP INTO GCD EXTENSION HOUSING. A new cup is supplied in GCD KIT
to GCD 2 speed exploded drawing page ... ASSEMBLYPREPARE NEW REAR OUTPUT SHAFT ASSYNOTE: High and low gears are re-assembled onto The new output shaft supplied in the kit. 1. REMOVE HIGH GEAR FROM TOYOTA OUTPUT SHAFT
2. REMOVE LOW GEAR FROM TOYOTA OUTPUT SHAFT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3. INSTALL HIGH GEAR TO NEW REAR OUTPUT SHAFT NOTE: High gear is pressed onto end WITHOUT spline. Press on the following parts: High gear, Output shaft front bearing, 4. INSTALL LOW GEAR TO NEW REAR OUTPUT SHAFT NOTE: Low gear is installed onto SPLINED end. Press on the following parts: Clutch sleeve, Low gear, Output shaft rear bearing. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5. INSTALL CLUTCH HUB ONTO GCD THRU-SHAFT 6. INSTALL SNAP RING ONTO THRU- SHAFT Select a snap ring that will allow minimal axial free play when Through Shaft is inserted into Rear Output Shaft 7. INSERT THRU-SHAFT INTO REAR OUTPUT SHAFT ASSEMBLY Insert Thru-shaft into High gear end of Output shaft. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SLEEVE TO FRONT OUTPUT SHAFT Install clutch sleeve with shift fork and shaft.9. INSTALL REAR OUTPUT SHAFT FRONT BEARING RETAINER 10. INSTALL REAR O ASSEMBLY INTO TRANSFER CASE8. INSTALL CLUTCH UTPUT SHAFT ASSEMBLY WITH SHIFT FORK AND SHAFT TO FRONT OUTPUT SHAFT 11. STICK THRUST WASHER TO TRANSFER REAR CASE 12. INSTALL TRANSFER REAR CASE
Torque: 650 kg-cm (47 ft.lb,64 N-m)
Torque:
13. INSTALL IDLER SHAFT O-RING AND LOCK PLATE
ADJUST REAR OUTPUT SHAFT PRELOAD14. INSTALL GCD EXTENSION HOUSING WITH OUTPUT SHAFT REAR BEARING CUP
15. INSTALL GCD REAR OUTPUT HEMI ASSEMBLY
16. INSTALL SPEEDO DRIVE GEAR ONTO SHAFT 17. INSTALL NEW SPACER ONTO SHAFT Supplied in GCD kit. 18. INSTALL NEW SPEEDO DRIVE HOUSING Supplied in GCD kit.
19. INSTALL REAR OUTPUT SHAFT ROLLER BEARING INTO SPEEDO DRIVE HOUSING Using suitable tool tap bearing onto shaft and seat into Housing. NOTE: Install bearing with open side facing inwards. 20. INSTALL CIRCLIP INTO SPEEDO DRIVE HOUSING 21. INSTALL NEW DUST DEFLECTOR ONTO REAR COMPANION FLANGE (Supplied with GCD kit) New deflector is same as front to suit speedo housing. 22. INSTALL REAR COMPANION FLANGE
23. INSTALL POWER-TAKE-OFF COVER.
24. REPLACE SPEEDOMETER DRIVEN GEAR OIL SEAL. (Only if necessary) 25. INSTALL SPEEDOMETER DRIVEN GEAR AND CABLE. TORQUE: 130 kg-cm (9 ft-lb, 13Nm) 26. INSTALL NEW REAR PROP- SHAFT. Supplied with GCD kit 27. INSTALL PLUG SPRING AND LOCKING BALL 28. INSTALL 4WD INDICATOR LIGHT SWITCH |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GCD OPERATIONAL TESTThe GCD is designed to un-lock and re-lock the common drive to front and rear axles when one axle attempts to overdrive the other axle during cornering. NOTE: The above de-coupling action operates in both forward and reverse gears. DE-COUPLE SIMULATION1. With the vehicle chocked for safety at the REAR wheels raise the front axle wheels off the ground. 2. FIRST LIGHTLY rotate the PROP-SHAFT of the raised axle clockwise and anti-clockwise. Observation: The transfer case common axle drive should appear to be solid and not capable of independent drive. 3. NOW FIRMLY rotate the driveshaft of the raised axle and the de-coupling can be felt as the prop-shaft breaks out and spins freely. Reverse the rotation of the raised axle prop-shaft and the re-coupling will occur. 4. Lower the raised axle and repeat the steps to check the REAR axle. FOR OPTIMUM PERFORMANCENOTE:1. It is very important that all 4 wheels are of matching diameter for optimum traction and performance. 2. During cornering, the GCD can be heard indexing as it un- locks and re-locks. This is quite normal.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
return to Gearing Dynamics home page... ... to GCD 2 speed exploded drawing page |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contact our sales department today!
03 5272 2844
+ 61 3 5272 2844
www.gearingdynamics.com